Installing a bridge at Bromont equestrian centre
Provide a bridge at the Bromont equestrian center for competitions and events and install it in only one day. An arched bridge made entirely in our factory and designed in collaboration with a consulting engineering firm. One section, no assembly required on site.
Bromont Equestrian Centre wanted to provide access to pedestrian all the while allowing vehicles and horse trailers to pass underneath. Carbonneau Group has manufactured and lifted/installed a one-piece arched bridge. The bridge rests on two concrete foundations and was in service only a few days after installation for the International Bromont.